Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
  • Home
  • Trending
  • State
  • Metro
  • National
  • International
  • Business
  • Feature
  • Entertainment
  • Sports
  • More..
    • Odisha Special
    • Editorial
    • Opinion
    • Careers
    • Sci-Tech
    • Timeout
    • Horoscope
    • Today’s Pic
  • Video
  • Epaper
  • News in Odia
No Result
View All Result
OrissaPOST - Odisha Latest news, English Daily -
No Result
View All Result

Chitrotpala irrigation project: Work stuck; cost escalates ten times over 3 decades

Post News Network
Updated: January 3rd, 2022, 07:48 IST
in State, Top Stories
0
Share on FacebookShare on TwitterShare on WhatsAppShare on Linkedin

Kendrapara: About 32 years ago, Chitrotpala irrigation project had been taken up with an aim of providing irrigation to 19,542 hectares of farmland in Garadpur, Marshaghai and Mahakalapara block in Kendrapara district and in Tirtol block of Jagatsinghpur district.

Then, the project had kindled hopes of agricultural growth for farmers of over 300 villages under these four blocks. Unfortunately enough, their dream is yet to be realised.

Also Read

Rainfall likely to continue across Odisha till August 18: IMD

2 hours ago
RSS chief Mohan Bhagwat

Population control the only answer to Delhi stray dog menace, says Bhagwat

3 hours ago

According to reports, 32 years after its inception, the project work is nowhere near completion while its cost has escalated to 10 times of its original cost estimate in two decades.

The project was initially estimated at only 39.94 crore in 1989, but its cost galloped to Rs 395.46 crore in 2012. The Asian Development Bank (ADB) had set a deadline for the project at 2019.

Since then, the work has been lying undone. Local farmers and residents have held the local leaders and administrative officials responsible for such apathy plaguing the project.

Sribatsa Samal, a farmer of Marshaghai, said that the work of the irrigation project has been halted at main canal of the Paika river.

“The project work at Tikhiri, Patalipanka, Takarapanga, Ameipal and Jadupur panchayats is yet to be started. Besides, the work of the main canal coming from the right side of Chitrotpala river has been halted at Kalabuda. The work should be carried forward through Garadpur, Pakhada, Patakura, Bedari, Talasanga and Garjang,” he said.

Moreover, there is need for construction of branch canals and sub-canals in the project areas so that farmlands can be irrigated.

As for the project, Zilla Parishad member (zone 26) Ganesh Chandra Samal said that former Patkura MLA Bijay Mohapatra had initiated efforts for the irrigation project in the larger interest of the farmers.

In 1989, Rs 39.94 crore was sanctioned for the project. Bijay Mohapatra was the water resources minister in the cabinet of the then Biju Patnaik-led government. At that time, project work was carried forward to some extent.

Later, its work was suspended. After repeated agitations by Zilla Jana Suraksha Manch, the cost of the project was revised at Rs 395.46 crore while deadline for its completion was set at 2014.

Although the work was resumed from 2016-17, it is far from completion. The deadline set by the ADB has come to an end.

“The fund utilised for the project is likely to go down the drain as its work fails to make headway,” said Sribasta Samal.

Social activist Pramod Kumar Swain observed that it was due to the apathy of the local leaders and the administration, the project work has failed to make progress over years.

The area is fertile enough to sustain crops, but lack of irrigation has scuttled the scope of agricultural growth, he added. ADM Pitambar Samal said that a meeting was held on the irrigation project while a decision was taken to hasten the project work.

PNN

Tags: Chitrotpalacost escalatesIrrigation projectJagatsinghpurKendraparaMahakalapara blockTirtol blockwork stuck
ShareTweetSendShare
Suggest A Correction

Enter your email to get our daily news in your inbox.

 

OrissaPOST epaper Sunday POST OrissaPOST epaper

Click Here: Plastic Free Odisha

#MyPaperBagChallenge

Jyotshna Mayee Pattnaik

December 12, 2019
#MyPaperBagChallenge

Pratyasharani Ghibela

December 12, 2019
#MyPaperBagChallenge

Jhili Jena

December 12, 2019
#MyPaperBagChallenge

Diptiranjan Biswal

December 12, 2019
#MyPaperBagChallenge

Archit Mohapatra

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Smitarani Sahoo

December 12, 2019
#MyPaperBagChallenge

Anshuman Sahoo

December 12, 2019
#MyPaperBagChallenge

Geetanjali Patro

December 12, 2019
#MyPaperBagChallenge

Rajashree Pravati Mohanty

December 12, 2019
#MyPaperBagChallenge

Sitakanta Mohanty

December 12, 2019
#MyPaperBagChallenge

Mrutyunjaya Behera

December 12, 2019
#MyPaperBagChallenge

Priyasha Pradhan

December 12, 2019
#MyPaperBagChallenge

Tapaswini Mallick

December 12, 2019
#MyPaperBagChallenge

Saishree Satyarupa

December 12, 2019
#MyPaperBagChallenge

Aman Kumar Barisal

December 12, 2019
#MyPaperBagChallenge

Manas Samanta

December 12, 2019
#MyPaperBagChallenge

Kamana Singh

December 12, 2019
#MyPaperBagChallenge

Ramakanta Sahoo

December 12, 2019
#MyPaperBagChallenge

Aishwarya Ranjan Mohanty

December 12, 2019
#MyPaperBagChallenge

Amritansh Mishra

December 12, 2019
#MyPaperBagChallenge

Bijswajit Pradhan

December 12, 2019
#MyPaperBagChallenge

Nishikant Rout

December 12, 2019
#MyPaperBagChallenge

Faiza Firdous

December 12, 2019
#MyPaperBagChallenge

Praptimayee Biswal

December 12, 2019
#MyPaperBagChallenge

Sarfraz Ahmad

December 12, 2019
#MyPaperBagChallenge

Akshaya Kumar Dash

December 12, 2019
#MyPaperBagChallenge

Pratik Kumar Ghibela

December 12, 2019
#MyPaperBagChallenge

Narendra Kumar

December 12, 2019
#MyPaperBagChallenge

Lopali Pattnaik

December 12, 2019

Archives

Editorial

Tariff Tactic

Tariff
August 13, 2025

The effects of US President Donald Trump’s imposition of a 50 per cent tariff on Indian goods have started to...

Read moreDetails

Conscious Capitalism

Conscious Capitalism
August 12, 2025

Companies have long justified sustainability initiatives as a way to boost their reputation, comply with external and internal standards, or...

Read moreDetails

Perpetual War

Benjamin Netanyahu
August 11, 2025

Almost two years into the war in Gaza, the Israeli security cabinet has approved yet another military escalation — a...

Read moreDetails

Strategic Blunder

Aakar Patel
August 10, 2025

In February 2018 the Trump White House drew up the ‘US strategic framework for the Indo-Pacific’. This paper, declassified in...

Read moreDetails
  • Home
  • State
  • Metro
  • National
  • International
  • Business
  • Editorial
  • Opinion
  • Sports
  • About Us
  • Advertise
  • Contact Us
  • Jobs
Developed By Ratna Technology

© 2024 All rights Reserved by OrissaPOST

  • News in Odia
  • Orissa POST Epaper
  • Video
  • Home
  • Trending
  • Metro
  • State
  • Odisha Special
  • National
  • International
  • Sports
  • Business
  • Editorial
  • Entertainment
  • Horoscope
  • Careers
  • Feature
  • Today’s Pic
  • Opinion
  • Sci-Tech
  • About Us
  • Contact Us
  • Jobs

© 2024 All rights Reserved by OrissaPOST

    • News in Odia
    • Orissa POST Epaper
    • Video
    • Home
    • Trending
    • Metro
    • State
    • Odisha Special
    • National
    • International
    • Sports
    • Business
    • Editorial
    • Entertainment
    • Horoscope
    • Careers
    • Feature
    • Today’s Pic
    • Opinion
    • Sci-Tech
    • About Us
    • Contact Us
    • Jobs

    © 2024 All rights Reserved by OrissaPOST